Lowongan Kerja (www.bilaboong.com) |
- Lowongan Kerja TNT Indonesia
- Lowongan Kerja Kawan Lama Sejahtera
- Lowongan Kerja Adhi Karya (Persero)
- Lowongan Kerja Sarulla Operations
Posted: 03 Sep 2015 08:16 PM PDT TNT is one of the world's largest express delivery companies. On a daily basis, TNT delivers close to one million consignments ranging from documents and parcels to palletised freight. The company operates road and air transportation networks in Europe, the Middle East and Africa, Asia-Pacific and the Americas. TNT made €6.68 billion in revenue in 2014. TNT aims to be a trustworthy, values-based company with a reputation for integrity, transparency and compliance. To support this aim, we have developed and implemented an Integrity Programme, and introduced Business Principles and related policies and procedures. Read more » Lowongan Kerja : <a href="http://www.bilaboong.com">www.bilaboong.com</a> | Facebook : <a target="blank" href="http://www.facebook.com/bilaboongkerja">www.facebook.com/bilaboongkerja</a> | Twitter : <a target="blank" href="http://www.twitter.com/bilaboong">www.twitter.com/bilaboong</a> |
Lowongan Kerja Kawan Lama Sejahtera Posted: 03 Sep 2015 08:03 PM PDT PT Kawan Lama Sejahtera is a leading commercial & Industrial Supply Company and leading domestic business-to-business distributor. With more than sixty thousands of products to choose from, we're a fast, convenient source for industrial supplies, equipment and repair parts. Serving as our grand value, long-lasting companionship can only be built when we have these characters: trustwothiness, know-how, tested-through-time, and reliability. Standing tall to our name, we combine the value with today's business drive: professionally aiming to be the leaderin providing machineries and industrial equipments. Read more » Lowongan Kerja : <a href="http://www.bilaboong.com">www.bilaboong.com</a> | Facebook : <a target="blank" href="http://www.facebook.com/bilaboongkerja">www.facebook.com/bilaboongkerja</a> | Twitter : <a target="blank" href="http://www.twitter.com/bilaboong">www.twitter.com/bilaboong</a> |
Lowongan Kerja Adhi Karya (Persero) Posted: 03 Sep 2015 07:58 PM PDT ADHI KARYA was initiated on March 11, 1960 when the Minister of Public Works set Architecten-Ingenicure-en Annnemersbedrijf "Associatie Selle en de Bruyn, Reyerse en de Vries N.V" (Associatie N.V.), one of the Dutch-owned company that was nationalized into PN Adhi Karya. Nationalization was intended to spur infrastructure development in Indonesia. ADHI status changed to a Limited Company on June 1, 1974 and approved by the Minister of Justice. ADHI was 100% owned by the Government of the Republic of Indonesia until end of 2003 when the Republic of Indonesia through the Minister of SOE, as the Authority of Shareholders, removed 49% of its shares to be offered to public through Initial Public Offering (IPO). This decision was followed by the registration of ADHI's shares in the Jakarta Stock Exchange (now Indonesia Stock Exchange) which also made ADHI as the first listed BUMN construction company in the stock exchange. Read more » Lowongan Kerja : <a href="http://www.bilaboong.com">www.bilaboong.com</a> | Facebook : <a target="blank" href="http://www.facebook.com/bilaboongkerja">www.facebook.com/bilaboongkerja</a> | Twitter : <a target="blank" href="http://www.twitter.com/bilaboong">www.twitter.com/bilaboong</a> |
Lowongan Kerja Sarulla Operations Posted: 03 Sep 2015 07:36 PM PDT The Sarulla Geothermal Power Project is located in the North Tapanuli district, in North Sumatra province, Indonesia. It is the largest single-contract geothermal power project to date. It is owned and will be operated by Sarulla Operations Ltd (SOL), a consortium company consist of Medco Power Indonesia, Ormat International, Itochu Corporation and Kyushu Electric Power Company. It has a Joint Operating Contract (JOC) with the concession holder PT. Pertamina Geothermal Energy (PGE), a subsidiary of the state-owned oil and gas company PT. Pertamina (Persero). Sarulla Geothermal Power Plant will have an installed capacity of 330MW which will be constructed in three phases of 110MW each. The construction of phase 1 commenced in 2014 and its commercial operation is expected in 2016. Phases two and three are expected to begin commercial operation in 2017 and 2018 respectively. Read more » Lowongan Kerja : <a href="http://www.bilaboong.com">www.bilaboong.com</a> | Facebook : <a target="blank" href="http://www.facebook.com/bilaboongkerja">www.facebook.com/bilaboongkerja</a> | Twitter : <a target="blank" href="http://www.twitter.com/bilaboong">www.twitter.com/bilaboong</a> |
You are subscribed to email updates from Lowongan Kerja | http://www.bilaboong.com To stop receiving these emails, you may unsubscribe now. | Email delivery powered by Google |
Google Inc., 1600 Amphitheatre Parkway, Mountain View, CA 94043, United States |
0 komentar:
Posting Komentar